|
ISLAMABAD,
Oct 28 (APP): The government would soon introduce smart electricity metering in
the country to eliminate complaints of inflated and manipulated billing, Deputy
Chairman Planning Commission of Pakistan, Salman Faruqui said here. He was
speaking at a one-day workshop on Development of Integrated Energy Modeling
System for Pakistan organized by the Planning Commission in co-operation with
the Asian Development Bank.
He
said the government was determined to enhance electricity generation,
saying that President Asif Ali Zardari has directed Ministry of Water and Power
to revamp the electricity sector by rationalizing and streamlining the
institutional set up.
He said the
president has also directed the ministry to reduce dependence on imported fuels
for electricity generation besides, undertaking major initiatives to conserve
energy and reduce line losses.
Salman
Faruqui said that pilot programmes would also be undertaken for replacing gas
with solar water heating systems as well as solar and renewable energy based
water pumping systems for irrigation.
The
Technical Assistance project for Development of Integrated Energy Modeling
System for Pakistan will be carried out by a Consultant Team consisting of
international experts from the International Resources Group and national
experts from MEConsult.
The
Planning Commission will be the executing agency to direct the project.
There
are two key objectives of the project including assist the Government of
Pakistan to develop an integrated energy model and build the institutional
capacity within the Planning Commission Energy Wing to ensure the sustainability of this modeling and planning capability, and its integration
into the
decision-making and policy formulation process in Pakistan.
Speaking on
the occasion, Parvez Butt, Member Energy Planning Commission, stressed the need
for devising long term strategies for energy conservation and for overcoming the
energy crisis on sustainable basis.
He was of
the view that after the completion of the modeling system, Pakistan would have a
modern center with computers, soft ware programmes, data base and trained
manpower, to which all the country’s energy related organizations would have
access, and where all the inputs would be fed and used to predict the future
scenarios and suggest actions so that such crisis does not happen again.
|