Construction work is underway on the flyover at Sheeranwala Gate. APP16-250921 LAHORE: September 25 – APP photo by Amir Khan Previous Post A vendor is arranging and displaying seasonal fruit Pear (Nashpati) at his roadside setup Next Post A woman looks at a traditional Khusa shoes kept for sale